How Many Bags of Concrete Do You Need Per Fence Post?

Quick answer: For one 4×4 post with 6 feet above ground, our estimate is about 3.8 bags of 60 lb standard concrete mix, so you would buy 4 bags (5 if you add a 10% planning allowance). That assumes a hole three times the post width, a buried depth of half the above-ground height, a 6 in dry-mix base and concrete stopping 3 in below ground level. For a 4×4 post set with 60 lb fast-setting concrete, using a 6 in gravel base, the estimate is about 3.2 bags, so 4 bags. These are estimates built on stated modeling assumptions, not construction recommendations. The charts below show 4×4 and 6×6 posts at 4, 5 and 6 feet above ground.

Read this first. The numbers on this page are estimates from simple geometry and the manufacturer’s published yields. They do not replace the instructions on your bag, an engineer’s advice, or your local building requirements. How deep and how wide a post hole should be depends on the post, the fence, the soil, the loads, the product instructions and applicable local rules.

The assumptions behind these numbers

Every figure below comes from one simple model. Each item is a modeling assumption or estimate, not a rule you must follow:

  • Post size: typical dressed lumber, using actual sizes: a 4×4 is 3.5 in by 3.5 in and a 6×6 is 5.5 in by 5.5 in (American Wood Council, NDS Supplement, Tables 1A/1B; SPIB also gives 3½ x 3½ in for a 4×4). Measure your own post; treated, rough-sawn, round and metal posts can differ.
  • Hole width (estimate): 3 times the measured actual post width, in a round hole. That is 10.5 in for a 4×4 and 16.5 in for a 6×6. 10.5 in is not a universal hole size.
  • Buried depth (calculation assumption): half of the above-ground height. This is not a depth recommendation.
  • Base (modeling assumption): a 6 in base under the post. In Chart A it is dry concrete mix; in Chart B it is gravel (see the notes under each chart).
  • Top gap (modeling assumption): the concrete stops 3 in below ground level.
  • Bag yields: the manufacturer’s “approximate” yields per bag, listed with each chart.
  • Allowance (planning assumption): 10% extra, shown in a separate figure. It is our planning allowance, not a manufacturer figure.

Bag counts are always rounded up, because a partial bag still means buying another bag. The raw (unrounded) number is shown first.

Bags of concrete per fence post: Chart A, standard concrete mix

Chart A follows the standard QUIKRETE Concrete Mix data sheet, which describes placing 6 in of dry concrete mix in the bottom of the hole and then mixing the concrete with water before placing it (QUIKRETE Concrete Mix, No. 1101, data sheet, revised October 2022). Yields per bag from the same sheet: 40 lb about 0.30 ft³, 50 lb about 0.375 ft³, 60 lb about 0.45 ft³, 80 lb about 0.60 ft³.

How to read each cell: raw bags → whole bags rounded up (bags with the optional 10% planning allowance). Example: 3.82 → 4 (5) means 3.82 raw bags, 4 whole bags rounded up, or 5 bags with the optional 10% planning allowance.

Table 1. Estimated bags per fence post, standard concrete mix with a modeled 6 in dry-mix base

PostAbove groundConcrete per post (ft³)40 lb bag50 lb bag60 lb bag80 lb bag
4×44 ft1.2044.01 → 5 (5)3.21 → 4 (4)2.68 → 3 (3)2.01 → 3 (3)
4×45 ft1.4624.87 → 5 (6)3.90 → 4 (5)3.25 → 4 (4)2.44 → 3 (3)
4×46 ft1.7205.73 → 6 (7)4.59 → 5 (6)3.82 → 4 (5)2.87 → 3 (4)
6×64 ft2.9739.91 → 10 (11)7.93 → 8 (9)6.61 → 7 (8)4.96 → 5 (6)
6×65 ft3.61112.04 → 13 (14)9.63 → 10 (11)8.02 → 9 (9)6.02 → 7 (7)
6×66 ft4.24814.16 → 15 (16)11.33 → 12 (13)9.44 → 10 (11)7.08 → 8 (8)

Chart A assumptions (estimates): a hole 3 × the actual post width, buried length = half of the above-ground height, a 6 in dry-mix base across the whole hole, concrete stopping 3 in below ground level, approximate yields. “Concrete per post (ft³)” is the base plus the ring around the post. Cells within about 0.05 of a whole number, such as 2.01, 8.02 and 6.02, can flip to the next bag with a small change in hole size or yield.

The standard sheet’s fence-post instructions do not state a gap below ground level. The 3 in gap in this chart is our modeling assumption, and filling the hole higher would take more concrete. The sheet also does not say whether the 6 in dry-mix base counts inside or on top of its depth rule; Chart A adds it on top, which is another modeling choice.

Bags of concrete per fence post: Chart B, fast-setting concrete (60 lb bag)

Chart B uses the QUIKRETE Fast Setting Concrete Mix, No. 1004-60, whose data sheet states that each 60 lb bag yields approximately 0.45 ft³ (QUIKRETE Fast Setting Concrete Mix 1004-60 data sheet). That sheet describes a hole depth of one-half of the above-ground post height, a hole diameter of 3 times the post diameter, and pouring dry mix to approximately 3 to 4 in from the top before adding water.

How to read each cell: raw bags → whole bags rounded up (bags with the optional 10% planning allowance). Example: 3.82 → 4 (5) means 3.82 raw bags, 4 whole bags rounded up, or 5 bags with the optional 10% planning allowance.

Table 2. Estimated bags per fence post, 60 lb fast-setting concrete with a modeled 6 in gravel base

PostAbove groundConcrete per post (ft³)60 lb fast-setting bag
4×44 ft0.9032.01 → 3 (3)
4×45 ft1.1622.58 → 3 (3)
4×46 ft1.4203.15 → 4 (4)
6×64 ft2.2314.96 → 5 (6)
6×65 ft2.8686.37 → 7 (8)
6×66 ft3.5067.79 → 8 (9)

Chart B assumptions (estimates): the same hole width, buried depth and 3 in top gap as Chart A, with a 6 in gravel base (not counted as concrete) and concrete only around the post.

QUIKRETE’s separate “Setting Posts” project sheet, written for fast-setting concrete, describes tamping the hole and placing 6 in of QUIKRETE All-Purpose Gravel or crushed stone in it “to aid in drainage,” and says to pour the dry fast-setting mix until it reaches 3 to 4 in from the top. The 1004-60 data sheet itself does not mention a gravel base. Chart B uses the 6 in gravel base as a modeling assumption drawn from the project sheet; the project sheet is undated.

Only the 60 lb fast-setting bag is charted. A 50 lb fast-setting spec sheet gives a per-bag yield only for slabs, not for post holes, so that figure is not used here.

Standard concrete mix vs fast-setting concrete: what changes

The two product types are not interchangeable. The yields, the way they go in the hole, the water and the waiting times come from different sheets and should not be mixed up.

Table 3. Standard vs fast-setting, as stated on each QUIKRETE data sheet

Standard concrete mix (No. 1101 sheet)Fast-setting concrete (1004-60 sheet)
Bag sizes with a stated yield used here40, 50, 60, 80 lb (also 90 lb)60 lb
How it goes in6 in of dry mix at the bottom, then mix with water before placing it in the holeDry mix poured to approximately 3 to 4 in from the top, then water poured in until the powder is saturated
WaterPer bag, from the sheet’s mixing table (start / maximum expected): 40 lb 3 / 4-1/2 pt; 50 lb 3-1/2 / 5-1/2 pt; 60 lb 4 / 7 pt; 80 lb 6 / 9 pt. The post instructions themselves give no amount.About 1-1/4 gallon per 60 lb bag, depending on soil conditions; holes deeper than 30 in are filled in lifts of 30 in or less
Set and waitWait 24 hours before the post is subjected to any strain. The sheet gives no set time.Sets in 20 to 40 minutes. Wait 4 hours before placing heavy objects.

Sources: standard sheet and fast-setting sheet. (pt = pint.)

The standard sheet says to mix the concrete with water before placing it in the hole. Do not treat the fast-setting dry-pour method as an instruction for standard mix. Other brands differ, so follow the instructions printed on your own bag.

A manufacturer example, limited to one case. QUIKRETE’s separate fast-setting spec sheet for 50 lb bags says two 50 lb bags will set a 4 in diameter post in a 10 in diameter hole 2 ft deep (1004-50 spec sheet, an older specification whose publication date is not confirmed here). That example is for a round 4 in post in a hole 2.5 times as wide, using 50 lb fast-setting bags. As an arithmetic check, using that sheet’s per-bag figure for slabs (0.375 ft³), the example works out to roughly 2.0 to 2.1 bags when the dry mix stops 3 to 4 in from the top. This is only a consistency check of the manufacturer’s example; the slab figure is not a confirmed post-hole yield, and the example does not carry over to a square 4×4, standard mix or a different hole width.

How the bag count is calculated

  1. Actual post size. A 4×4 is 3.5 in by 3.5 in, so it takes up 12.25 in² of the hole. A 6×6 is 5.5 in by 5.5 in (30.25 in²).
  2. Hole width and depth. The manufacturer sheets say the hole should be about 3 times the post diameter. For a square post we apply that to the measured width, which is our estimate. Buried length is half of the above-ground height, our calculation assumption.
  3. Base and top gap. Under Chart A the hole gets a 6 in dry-mix base across the full hole area. Under Chart B the 6 in base is gravel and is not counted as concrete. In both, the concrete stops 3 in below ground level.
  4. Cubic feet. Concrete volume = (hole area − post area) × concrete height ÷ 1,728, with inches in and cubic feet out (1,728 in³ = 1 ft³). Chart A adds the base: hole area × 6 in ÷ 1,728. Divide cubic feet by 27 for cubic yards.
  5. Bags. Divide the volume by the bag’s yield, then round up. For the optional 10% allowance, multiply the volume by 1.10 before dividing and rounding up.

For a generic round hole that does not subtract the post or model a base, see our concrete footing calculator. It does not subtract the volume of the post, so its answer for the same hole is larger than the post-aware figures here. For other bag-count jobs, try the concrete bag calculator, and use the gravel calculator to size a gravel base.

Worked example: 4×4 post, 6 ft above ground, 60 lb standard bag

  • Hole width: 3 × 3.5 in = 10.5 in (an estimate). Hole area = π × 10.5² ÷ 4 = 86.59 in². Post area = 12.25 in².
  • Buried length: 6 ft ÷ 2 = 3 ft (36 in), our calculation assumption. Hole depth = 36 in + 6 in base = 42 in.
  • Base: 86.59 × 6 ÷ 1,728 = 0.301 ft³.
  • Ring around the post: (86.59 − 12.25) × 33 ÷ 1,728 = 1.420 ft³ (33 in = 36 in minus the 3 in top gap).
  • Total: 0.301 + 1.420 = 1.720 ft³ (about 0.064 yd³).
  • Bags: 1.720 ÷ 0.45 = 3.82, which rounds up to 4 bags.
  • With a 10% allowance: 1.10 × 1.720 ÷ 0.45 = about 4.2, which rounds up to 5 bags.

With 60 lb fast-setting concrete (Chart B), the same post needs 1.420 ft³ (1.4197 before rounding) and 1.4197 ÷ 0.45 = 3.15, which rounds up to 4 bags (4 with the allowance). Figures in the examples are rounded for display; the charts use unrounded values.

What if the hole is wider? A 12 in hole for a 4×4 post

Many holes are dug wider than the 3 × width estimate. As a sensitivity check only (not a recommendation), here is a 4×4 post in a 12 in hole, with the same depth, base and gap assumptions:

Table 4. 4×4 post in a 12 in hole: raw bags → whole bags

Above groundChart A concrete (ft³)Chart A 60 lbChart A 80 lbChart B concrete (ft³)Chart B 60 lb
4 ft1.6183.60 → 42.70 → 31.2262.72 → 3
5 ft1.9684.37 → 53.28 → 41.5763.50 → 4
6 ft2.3195.15 → 63.86 → 41.9264.28 → 5

At 6 ft above ground, the wider hole raises the 60 lb standard-mix count from 3.82 (4 bags) to 5.15 (6 bags), and the 60 lb fast-setting count from 3.15 (4 bags) to 4.28 (5 bags). Hole width is the biggest uncertainty in any bag estimate. Measure your actual hole and recalculate.

Why QUIKRETE’s depth guidance looks different from sheet to sheet

Chart depth is an assumption, and the manufacturer’s own documents do not say exactly the same thing:

  • The fast-setting data sheet says the depth of the post hole “should be one-half of the above ground post height” (1004-60 sheet).
  • The standard concrete mix sheet says hole depth should be “1/3 the overall post height” (No. 1101 sheet).
  • QUIKRETE’s “Setting Posts” project sheet for fast-setting concrete says hole depth should be “1/3 the overall post length,” plus 6 in (150 mm) for the gravel base (project sheet).

None of these sheets defines “overall.” If “overall” means the full post, including the buried part, then one-third of the overall length equals one-half of the above-ground height, which is the depth we used. That reading is ours, not the manufacturer’s. If it instead meant the above-ground height alone, the buried depth would be shallower. Because of this, the charts show H/2 only as a labeled calculation assumption. They are not a statement that this depth is right for your fence. The appropriate depth depends on the post, the fence, soil, loads, the product instructions and applicable local requirements.

Bags for a whole fence: a 10-post example

Say a run uses ten 4×4 posts, each 6 ft above ground, with the same model assumptions as the charts. Total concrete is 17.204 ft³ for standard mix with a dry-mix base (10 × 1.720) and 14.197 ft³ for the fast-setting model (10 × 1.420).

Table 5. Whole bags for ten 4×4 posts, 6 ft above ground

BagPooled (round up once)Rounded per post (whole bags per post × 10)Pooled with 10% allowance
Standard 40 lb586064
Standard 50 lb465051
Standard 60 lb394043
Standard 80 lb293032
Fast-setting 60 lb324035

Pooled vs per-post rounding. “Pooled” adds up the volume for all ten posts and rounds up once at the end. That works only if leftover partial bags are actually used in other holes. “Rounded per post” rounds each hole up to whole bags first, which is the safer count if every hole gets only whole bags. Pooled is never larger than per-post. The allowance column applies 10% to the total volume before the single round-up, so do not add 10% on top of a number that is already rounded up.

When these numbers do not apply

  • Frost depth and local requirements. Frost depth varies by location and is set locally. This page does not give a frost depth and does not say fence posts must go below the frost line. Ask your local building department whether your fence needs a permit or has footing requirements. According to a secondary summary, the International Residential Code covers buildings, bases footing depth on a locally supplied frost line, and does not mention fences. Treat that as background only: the applicable local code has not been checked here. The standard QUIKRETE sheet also says to follow local building codes for load-bearing applications.
  • Gate, corner, tall and structural posts. These carry different loads, and a deck or other structural post is a different job. Ask a professional or your local authority.
  • Wet, sandy or soft soil. The charts assume an idealized round hole and say nothing about soil. Real holes are rarely perfect cylinders.
  • Round and metal posts. Use the measured diameter and your own geometry.
  • Other brands. Yields, water and instructions differ by brand and bag size. Use the numbers on your bag.

Frequently asked questions

Can I pour standard concrete mix into the hole dry?

The standard QUIKRETE Concrete Mix sheet says to place a 6 in dry-mix base, then mix the concrete with water before placing it in the hole. The dry-pour-then-water method comes from the fast-setting sheets and applies to that product. Follow your own bag’s instructions.

What is the difference between standard and fast-setting concrete for posts?

In the QUIKRETE sheets cited here, standard mix is mixed with water before placing and the post waits 24 hours before strain; fast-setting is poured dry to about 3 to 4 in from the top, saturated with water, sets in 20 to 40 minutes and waits 4 hours before heavy objects. See the comparison table above.

How wide should the hole be?

The manufacturer sheets say about 3 times the post diameter. We apply that to the measured width of a square post as an estimate. A wider hole needs more concrete, as the 12 in example shows.

How many 80 lb bags for one 4×4 post with 6 ft above ground?

In Chart A, 2.87 raw bags, so 3 bags (4 with a 10% allowance). Fast-setting 80 lb bags are not charted because no 80 lb fast-setting yield was found in the sheets reviewed.

Do I need gravel under the post?

It depends on the product instructions and your site. The standard QUIKRETE Concrete Mix sheet describes a 6 in base of dry concrete mix. A separate QUIKRETE project sheet for fast-setting concrete describes a 6 in gravel base “to aid in drainage.” Drainage and soil conditions are local questions, so follow your own bag’s instructions and local requirements.

How deep should the hole be?

There is no single answer here. Manufacturer sheets differ in wording (see above), and your post, fence, soil, loads and local requirements decide. Check with your local building department.

Related calculators and guides

Limits and sources

These are estimates. They assume an idealized round hole, approximate yields and the modeling choices listed near the top, and real quantities vary with the actual hole, spillage and mix. They do not replace manufacturer instructions, structural advice or local code. We are not affiliated with or endorsed by QUIKRETE; its data sheets are cited only as the source of the yields and instructions quoted.

Sources:

  • QUIKRETE Concrete Mix No. 1101 data sheet (revised October 2022): PDF
  • QUIKRETE Fast Setting Concrete Mix No. 1004-60 data sheet (no revision date shown): PDF
  • QUIKRETE Fast-Setting Concrete #1004-50 spec data sheet (publication date not confirmed): PDF
  • QUIKRETE “Setting Posts” project sheet for fast-setting concrete (no date shown): PDF
  • American Wood Council, NDS Supplement Tables 1A/1B, nominal and dressed lumber sizes: PDF
  • SPIB, nominal vs actual lumber sizes (4×4 only): blog
  • IRC frost-line context (secondary source; the official adopted code was not checked): JASPECTOR summary

Related tools: how our calculators work · all concrete calculators

Related: Fence Post Concrete Calculator · Sonotube Concrete Calculator